Ivanhoe East 3079 · Banyule City Council

Builder and renovations in Ivanhoe East, VIC 3079

Ivanhoe East is a small, established suburb beside the Yarra River, with heritage controls in places such as the Beauview Estate precinct. Renovation work here usually starts with the planning controls.

Illustrated map of Melbourne with Ivanhoe East highlighted, showing where Unitex Building & Construction Group services
Servicing Ivanhoe East 3079Banyule City Council

In short

Unitex Building & Construction Group services Ivanhoe East (VIC 3079), about 10 km north-east of the Melbourne CBD, in the Banyule City Council area. In Ivanhoe East we renovate bathrooms, kitchens and laundries, and paint, with care where heritage controls apply. We visit the site, check the planning controls that apply and give you a written quote before any work starts.

Updated · Unitex Building & Construction Group, Melbourne

Services in Ivanhoe East 3079

Builder and renovations in Ivanhoe East

In Ivanhoe East we renovate bathrooms, kitchens and laundries, and paint, with care where heritage controls apply.

Bathroom renovations in Ivanhoe East

Full bathroom and ensuite renovations for established homes, including heritage precincts: strip-out, repairs behind the walls, waterproofing to the current standard, tiling and fit-out, with plumbing and electrical by licensed trades.

Bathroom renovations

Kitchen renovations in Ivanhoe East

New kitchens planned around how you cook and store things: layout, cabinetry, benchtops, splashbacks and appliances, installed in the right order so you’re without a kitchen for as short a time as possible.

Kitchen renovations

Laundry renovations in Ivanhoe East

Laundries with more bench space and storage, from a full room to a laundry in a cupboard, with the wet areas waterproofed before tiling.

Laundry renovations

House painting in Ivanhoe East

Interior and exterior painting for established homes, including heritage precincts, with the surfaces patched, sanded and primed first. Under a heritage overlay, painting a surface that hasn’t been painted before can need a planning permit, so we check first.

Interior and exterior painting

New home builder in Ivanhoe East

New Class 1 homes and villa units built from the slab to handover, plus Class 10a garages, carports and sheds. New homes are built all-electric from 2027, and we plan for that from the start.

New homes

Building supervision in Ivanhoe East

Oversight of your building project, trade coordination and photo reports, so you know where the job stands without being on site.

Building supervision

Every quote is in writing, with the scope, inclusions and payment stages. Our renovation costs guide explains what drives the price.

Ivanhoe East

Homes and building in Ivanhoe East

The Beauview Estate Heritage Overlay precinct covers properties such as those on York Street, King Street and Beauview Parade. Older homes include Charterisville, built around 1840 from sandstone quarried on site.

Residents tend to stay a long time (an average of 16 years, according to a 2010 analysis cited on Wikipedia), which suits renovating a home you plan to keep.

Before you start

What to check first in Ivanhoe East

  • Get a free planning property report for your address from VicPlan. It shows the zone and any overlays (such as heritage, flooding or vegetation) that apply to your Ivanhoe East block.
  • Under a heritage overlay, a planning permit is generally needed to demolish, to change the outside of the building, and to paint a surface that hasn’t been painted before, so allow time for that before the building permit.
  • Many Ivanhoe East homes were built well before 1990, so before a renovation strips out walls, floors or eaves, check for asbestos. WorkSafe Victoria notes asbestos can be found in buildings built before 1990 (WorkSafe Victoria).

Planning questions for Ivanhoe East go to Banyule City Council: do I need a building or planning permit?. Building permits are issued by a registered building surveyor.

Questions

Ivanhoe East questions

Which council handles planning permits in Ivanhoe East?

Banyule City Council, under the Banyule Planning Scheme. A free VicPlan planning property report shows the zone and overlays for your address, and the council can tell you whether your project needs a planning permit.

Is Ivanhoe East under a heritage overlay?

Parts of it are, including the Beauview Estate precinct. A VicPlan report shows whether your address is affected. If it is, external changes, demolition and painting a surface that hasn’t been painted before usually need a planning permit.

How much does a renovation or new build cost in Ivanhoe East?

It depends on the job, the size, the finishes and what we find on site, so we don’t publish a price list. For established homes, including heritage precincts in Ivanhoe East, we visit first and then give you a written, itemised quote. Our renovation costs guide explains what drives the price.

Do you work in Ivanhoe East?

Yes. We service Ivanhoe East (VIC 3079) for renovations, new homes and building supervision. Send us your address and a short description of the job through our contact page, and we’ll arrange a time to look at it.

General information for Victorian homeowners, checked October 2026. Rules change, so confirm with your building surveyor, council or the Building and Plumbing Commission.

Sources for this page

Local facts checked October 2026. We service Ivanhoe East; this page doesn’t mean we have an office there.

Planning work in Ivanhoe East?

Tell us your address and what you’re planning, and we’ll talk it through.

Contact